27,396 research outputs found

    Power load forecasting

    Get PDF
    For the electric power factory, the power load forecasting problem, including load forecasting and consumption predicting, is crucial to work planning. According to the predicting time, it can be divided into long-term forecasting, mid-term forecasting, short-term forecasting and ultra-short-term forecasting. The long-term and mid-term forecasting are mainly used for macro control, and their forecasting time arrange are from one year to ten years and from one month to twelve months respectively. The short-term forecasting which prediction time is from one day to seven days is used in generators macroeconomic control, power exchange plan and some other areas. Predicting the situation in next 24 hours is named as the ultra-short-term forecasting which is used for failure prediction, emergency treatment and frequency control. In general, the forecast accuracy is different for different prediction time. The longer is the time, the lower accurate is the prediction. As the unique power supplier in Huizhou (China), Huizhou Electric Power wants to know the solution to the problems: 1. Prediction of the total electrical consumption and the peak load of the city in 2006 based on the economy development and the feature of the city. 2. Monthly prediction of the consumption and peak load in 2006. 3. Daily prediction of the consumption and peak load from July 10th to 16th in 2006. 4. Prediction of the load every 15 minutes of July 10th. 5. Real-time forecasting which means to amend the existing load prediction for next 15 minute

    Unravelling Strings at the LHC

    Full text link
    We construct LHC signature footprints for four semi-realistic string/MM theory vacua with an MSSM visible sector. We find that they all give rise to limited regions in LHC signature space, and are qualitatively different from each other for understandable reasons. We also propose a technique in which correlations of LHC signatures can be effectively used to distinguish among these string theory vacua. We expect the technique to be useful for more general string vacua. We argue that further systematic analysis with this approach will allow LHC data to disfavor or exclude major ``corners'' of string/MM theory and favor others. The technique can be used with limited integrated luminosity and improved.Comment: 34 pages, 16 figure

    Feasibility study of thin film tunnel cathodes

    Get PDF
    Thin film tunnel cathodes evaluated for use in ultrahigh vacuum gauge
    corecore